Sep 12, 2010
8 years 2 months BOM work in progress. Completed generation of capacitor characteristics.
8 years 2 months atusd/cam/pcb.pl: updated for new board shape
8 years 2 months Moved cam/ to atrf/cam/
8 years 2 months Added antenna tuning "tail" suggested by Joerg. Made board slimmer.
8 years 2 months Corrected small footprint errors. Made 0R "inductor" a resistor.
8 years 2 months bom/: automatic BOM generation (work in progress)
Sep 11, 2010
8 years 2 months Added Digi-Key catalog data for automated BOM processing.
8 years 2 months Applied clock voltage divider fix and corrected too closely spaced via.
8 years 2 months Removed DTC123JE transistor files. (Was used only in 20100903 design.)
8 years 2 months atusd/tests/psd*: first transmit power spectral density measurement
Sep 10, 2010
8 years 2 months Updated to do list.
8 years 2 months New ECN about clock circuit of atusd boards. Measured (absence of) effect of
8 years 2 months Moved the ECNs from atrf/ecn to the top-level.
8 years 2 months Oops. The atusb boards are of course 20100813. 20100902 was the first
8 years 2 months Performance comparison of atusb vs. atusd.
8 years 2 months Added interrupt polling support for atusb.
Sep 9, 2010
8 years 2 months atspi-rssi cleanup: wait for interrupt, exit cleanly.
8 years 2 months Make wait_for_interrupt available to all atspi tools.
8 years 2 months tools/Makefile.common: added quiet compilation
8 years 2 months Cleaned up interrupt handling in atspi-txrx. Report ED. Shut down at end.